Edirne-Topkapi light rail system as a double line viaduct, 1 tunnel and 950m. it consists of a level crossing of 5.2 km in length, as a long route, it was planned to connect the existing Edirne line to the Topkapi location and reduce heavy pedestrian and vehicle traffic, and its construction began in September 2007.